Font Size: a A A
Keyword [Gob-Side Entry Retaining]
Result: 161 - 180 | Page: 9 of 10
161. Research And Application Of Gob-side Entry Retaining In JinFeng Large Mine Height Coalface
162. Instability Mechanism And Control Technology Of Surrounding Rock In Gob-side Entry Retaining Of Shallow Embedment And Without Filling Wall
163. Study On Reasonable Filling Ratio In Solid Backfilling With Gob-side Entry Retaining Mining
164. Research On Mechanism And Controltechnology Of Floor Heave In Gob-side Entryretaining Of Licun Coal Mine
165. Study On Surrounding Rock Control Of Gob-side Entry Filling In Lingzhida Hard Top Plate Working Face
166. Top-cutting And Gob-side Entry Retaining Technology For Transporting Flat Roadway In 10902 Working Face Of Jingu Mine
167. Study On The Technology Of Gob-side Entry Retaining Along Thin Goaf Under Goaf In Liangshuijing Coal Mine
168. The Principle Of Gob-side Entry Retaining And The Stability Of Surrounding Rock In Deep Shaft Gangue Filling Working Face
169. Study On New Technique And Application Of The Formwork Support For Gob-side Entry Retaining In Coal Mine
170. Research On Mechanism And Surrounding Rock Controlling Of Gob-side Entry Retaining Under Thick-Layer Composite Roof In Deep Coal Mine
171. Study On Roof Stability And Collaborative Control Of Gob-side Entry Retaining By Roof Cutting In Deep Mine
172. Surrounding Rock Control Mechanism And Application Of “Support-Unloading” Combined Technology For Gob-Side Entry Retaining In Shallow Coal Seam
173. Research On Floor Heave Control Technology Of Gob Side Entry Retaining By Roof Cutting And Pressure Relief In Selian 2 Coal Mine
174. Study On High Ductile Concrete Materials For Roadway Side Support In Gob-side Entry Retaining Under High Geo-stress
175. Characterization And Prediction Of Bearing Capacity Of Roadside Backfilling Concrete Based On Ultrasonic Test
176. Study On The Stability And Grouting Reinforcement Of The Gob-side Entry Retaining With Solid Backfilling
177. Application Of Flexible Model Gob Side Entry Retaining In A Mine Of Shendong Mining Area
178. Study On The Roadside Packing Gob-side Entry Retaining With High-Water Packing In 22301 Work Face Of TunLan
179. Study And Application Of Surrounding Rock Control Technology For Gob-side Entry Retaining In 3405 Working Face Of Xinyuan Coal Mine
180. Study On Gob-side Entry Retaining Tchnology In Medium-thick Seam Of Kaiyuan Coal Mine
  <<First  <Prev  Next>  Last>>  Jump to