Research On Project Schedule Management Of The Telecom Station Construction In J City

Posted on:2022-10-08Degree:MasterType:Thesis
Country:ChinaCandidate:P X ChenFull Text:PDF
GTID:2518306728964089Subject:Project management
Abstract/Summary:PDF Full Text Request
In today's information society,Communication network is the basis of big data load and interaction.To meet the demand of loading huge amounts of data,Communication operators need infrastructure construction to improve its communications network capacity.As the important elements of telecom network infrastructure,The construction progress of the Telecom Stations have a close relationship with the bearing capacity of the network.So my research based on Project Scheduling Management of the Telecom Station Construction in J City.The study uses the theory of literature combined with the actual case,combining qualitative and quantitative analysis,and comparative analysis and logic analysis method,mainly based on the theoretical analysis of the project schedule management methods,according to the specific indicators and requirements of the construction project of the telecom room,considering internal and external impact conditions,equipment,material supply,cut over the debugging time,labor costs,the allocation of resources and other related construction factors,all kinds of effective data collection and analysis,project management network model is established.And through the analysis of the key working on the project,milestones,draw the project progress,double code network diagram to find the critical path of network diagram.On the project schedule of the telecom room work breakdown,time limit for a project estimation at the same time,dynamic tracking monitor projects,according to the progress of the implementation to adjust in a timely manner,and take effective response measures to ensure all work of the project completed on time.First,starting from the background and significance of research projects,through collecting domestic and foreign research present situation and development trend,to determine the main content of study and train of thought,method,etc.According to the research content and direction for the research of theoretical basis,mainly from the concept and main content of project management,the concept of project schedule,and the preparation steps,network planning technique,such as management theory,the concept,significance and method of project progress control,process control and optimization method,etc.Based on the theoretical basis for the research,based on the basic situation of the project of the telecom station,determine the communication machine room the basic content of the project schedule planning.This project work breakdown,and determine the project milestones,prioritize and work activities,the estimated time of each work activity of project responsibilities distribution,calculating the time parameters of important,find out the critical path of the construction project of the telecom room.In the case of the initial schedule,through the analysis of the shortcomings in the course of construction project preliminary plan of the telecom room,using the method of the project schedule optimization of the construction project of the telecom room of the initial schedule optimization.Considering costs,time and resource constraints,by optimizing the critical path and non-critical path,the related resources configuration and overlapping relationship between process to adjust the construction schedule of the telecom room,based on the key work procedure analysis and non-critical some optimization measures are put forward.Finally,from the schedule and optimization analysis in this paper,the basic conclusion,and in this paper,the deficiencies and to solve problems,and provide experience for reference for the implementation of other projects.
Keywords/Search Tags:Project Management, Network Diagram, Schedule, Schedule Control, CPM
PDF Full Text Request
Related items