Font Size: a A A

Simulation study to determine the feasibility of injecting hydrogen sulfide, carbon dioxide and nitrogen gas injection to improve gas and oil recovery oil-rim reservoir

Posted on:2013-08-14Degree:M.EngType:Thesis
University:The Petroleum Institute (United Arab Emirates)Candidate:Eid, Mohamed El GoharyFull Text:PDF
GTID:2451390008965280Subject:Engineering
Abstract/Summary:
This study is combining two important and complicated processes; Enhanced Oil Recovery, EOR, from the oil rim and Enhanced Gas Recovery, EGR from the gas cap using nonhydrocarbon injection gases. EOR is proven technology that is continuously evolving to meet increased demand and oil production and desire to augment oil reserves. On the other hand, the rapid growth of the industrial and urban development has generated an unprecedented power demand, particularly during summer months. The required gas supplies to meet this demand are being stretched. To free up gas supply, alternative injectants to hydrocarbon gas are being reviewed to support reservoir pressure and maximize oil and gas recovery in oil rim reservoirs.;In this study, a multi layered heterogeneous gas reservoir with an oil rim was selected to identify the most optimized development plan for maximum oil and gas recovery. The integrated reservoir characterization model and the pertinent transformed reservoir simulation history matched model were quality assured and quality checked. The development scheme is identified, in which the pattern and completion of the wells are optimized to best adapt to the heterogeneity of the reservoir. Lateral and maximum block contact holes will be investigated.;The non-hydrocarbon gases considered for this study are hydrogen sulphide, carbon dioxide and nitrogen, utilized to investigate miscible and immiscible EOR processes.;In November 2010, re-vaporization study, was completed successfully, the first in the UAE, with an ultimate objective is to examine the gas and condensate production in gas reservoir using non hydrocarbon gases.;Field development options and proces schemes as well as reservoir management and long term business plans including phases of implementation will be identified and assured. The development option that maximizes the ultimate recovery factor will be evaluated and selected.;The study achieved satisfactory results in integrating gas and oil reservoir management methodology to maximize both fluid recovery and free up currently injected HC gases for domestic consumption. Moreover, this study identified the main uncertainty parameters impacting the gas and oil production performance with all proposed alternatives.;Maximizing both fluids oil and gas in oil rim reservoir are challenging. The reservoir heterogeneity will have a major impact on the performance of non hydrocarbon gas flooding. Therefore, good reservoir description is a key to achieve acceptable development process and make reliable prediction. The lab study data were used successfully to as a tool to identify the range of uncertainty parameters that are impacting the hydrocarbon recovery.
Keywords/Search Tags:Gas, Recovery, Oil, Reservoir, Rim, EOR, Hydrocarbon
Related items