Font Size: a A A

ISO17025 Project Team Management Improvement Stuty In MEAS

Posted on:2020-02-25Degree:MasterType:Thesis
Country:ChinaCandidate:Y X DengFull Text:PDF
GTID:2439330623951168Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Measurement Specialties(shenzhen)co.,LTD.Vibration Calibration lab ISO17025 approval application project is a very special project whose team members are come from diffetent functional departments and the project manager has no official,integrated positional power,temporary authority only.How to solve issues like team organizing,capability cultivate,communication management,progress control,assesement and motivation,especially to control the "loose" team,leading the "loose" team effectively has great significance in both thery and practice.This paper based on the project management theory and refer to the latest study documents,analyzing a series issue of the projects alike,provides targeted improvement actions,such as,reforming the organization struction by introducing solid line and dotted line to the O-chart to authorize the project manager;Linking the performance in specific project to the year-end assessment to improve the team members' enthusiasm fundamentally;Clarifying the responsibility and authority to improve the execution;Grouping the team to core team and assist team,matching different communication mechanism to ensure the communication effect;Establishing proper assessment and moltivation mechanism to improve the attractiveness of the team,essuring the obtainess feeling of every member.In this paper,the experience and lessons learnt of carrying out such projects are studied and verified by practice.Especially,in fact the process of pushing a project forward is a process of removing constraints.Managing a project team is to manage the expectations of team members.In this paper,some laws of project psychology are applied to communication and management in project development.The conclusion in this paper would improve the management level and efficiency of the company's project team greatly and facilitate the company's MBP strategy.In the meantime,it provides useful reference for enterprises engaged in the calibration industry,as well as independent laboratories and scientific research institutions facing laboratory accreditation.
Keywords/Search Tags:MEAS, Loose team, Project Management Without Authority
PDF Full Text Request
Related items