Font Size: a A A

The Research On Safety Risk Management Of Tianjin Railway Station Orbital Transfer Center

Posted on:2016-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:F HuoFull Text:PDF
GTID:2322330485451898Subject:Business administration
Abstract/Summary:PDF Full Text Request
With the rapid development of Tianjin urban construction, to better meet the travel demand of the public, in the gradual implementation, the overall implementation of urban rail transit planning and a lot of car-use urban public transport priority policy appears to realize the integration of the transport hub the desire is particularly urgent. The safe operation of an integrated transport hub not only affects the unobstructed and safe area public transportation system, but also related to social harmony and stability, and the major issues of life and property safety. The growing complexity of the road system, rail traffic safety situation increasingly severe security risks brought together railway passenger transport, bus stations, rail-way, buses, taxis and other integrated transport hub will become more prominent. Nowadays, the Transportation-Hub-Operations-Management to identify and manage security risks Source certain particularity, in the face of specific risks inherent in these theories are often out of their control, which make us not easy and clearly to recognize the hazard operations, meanwhile increased the difficulty of controlling risk source. Therefore, the research hub for security risk management to meet the needs of modern traffic safety administration has a very important significance.In this thesis, based on the Tianjin Railway Station Orbital Transfer Center(hereinafter referred to Tianjin Hub) as the research background, analysis and study its safety and practical application of risk management in the region, for risk source identification, risk source assessment, source control and other risk management tools research and consideration, summarized lessons Tianjin Railway Station transportation hub of security risk management, use the dynamic management principle source of security risk monitoring, risk assessment fuzzy comprehensive judgment method, and proposed security risk sources responses policy, and thus a security risk that may arise effectively circumvented.
Keywords/Search Tags:transportation hub, risk source, risk source identification, risk source assessment, risk source control
PDF Full Text Request
Related items