Study On Process Interface Management To EPC Contracting Project

Posted on:2014-06-20Degree:MasterType:Thesis
Country:ChinaCandidate:L J FanFull Text:PDF
GTID:2272330431499593Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
Abstract:In recent years,China’s increasing infrastructure investment, EPC project has become the focus of attention, at the same time, more people began to pay attention to the interface of engineering project management, the academic circles also reinforce the research on interface management. The interface problem of improper handling will make too many problems in terms oftechnology transfer, contract management and organization and coordination,implementation will not only affect the EPC project objectives, but also to the EPC project’s overall management level impact. Therefore, research on theEPC project interface problem is very important.After finishing the EPC general contract model and interface management theory, based on field investigation, document retrieval, theoretical analysis and case analysis of the mode of interface management issues of EPC general contract project analysis of the system, and discuss the EPC general contract project engineering interface, interface and interface management contract method.First, briefly expounds the connotation of EPC project interface management theory, the EPC project organization mode and EPC project interface system has carried on the system analysis, the three major elements-engineering interface, contract and organizational interfaces and interface, this paper briefly introduces the concept of the three the interface to a type.Secondly, based on system analysis of EPC project interface system, starting from the engineering interface, interface and interface contract organization of these three types of interface, detailed introduces the concept, the three types of Genesis and classification, and combined with the characteristics of interface types, in-depth analysis of the content of these three types of interface finally, to explore the management methods of these three types of interface.Finally, taking ZY project as an example, introduces the general situation of the project and the scope of general contracting, and then summarize the engineering contract interface, interface and tissue interface concretemanagement method, the specific process and measures of EPC projectinterface management, and obtains the beneficial...
Keywords/Search Tags:EPC general contracting project, Engineering contractinterface, Interface, Iissue interface
PDF Full Text Request
Related items