Font Size: a A A

Management In Formation System Of Gas Installation Engineering

Posted on:2014-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:M MaFull Text:PDF
GTID:2268330401464347Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the development of urbanization construction, supporting the use of naturalgas as a clean energy infrastructure, the scale of gas installation engineering willbecome more and more large, the requirements of engineering, construction period arealso getting higher and higher. In China, the level of informatization, which the smalland medium-sized gas installation enterprise is low, its development is lagging. It showsthat gas installation project management efficiency is low, and the cost is high. It affectsthe gas installation progress of the project.At present, to improve the efficiency of information management and the level ofenterprises, domestic medium and small gas installation business bring in productmanagement information system software integration. But most of the softwaredevelopment company is not familiar with the special process gas installationengineering, resulting in the software product is not entirely consistent with the actualsituation, there are some defects in some functions of the system, so that themanagement system is useless in the promotion and Implementation of the actualprocess. According to the research that many domestic large-scale gas enterprises adoptmanagement information systems which are made by the software company, fullydesigned and developed according to the management process and the characteristics ofthe enterprise. But due to the development of the system includes the enterprise toomuch their own characteristics, combined with the developing period is long, itoccupies much manpower and resources, with cumbersome process, which causesuneconomic cost and it doesn’t apply to the majority of small and medium-sized gasenterprises.Information management system of gas in the installation project, combined withthe actual characteristics of the project, to develop in line with the actual constructionmanagement needs of the system function, the Microsoft Windows system as theplatform, using the browser/server mode (B/S), provides a small gas solution gasinstallation enterprises.In the whole system, I mainly complete material management, construction management, construction process management modules.1. Partial functional material management module involves the procurement,supply, feeding, discharging.2. Construction management relates to the construction personnel, managementpersonnel, vehicles, equipment, and arranges the schedule.3. Construction process management relates to the safety supervision, qualitysupervision, supervision, and the establishment of the construction logs.
Keywords/Search Tags:Management information systems, materials management, constructionmanagement, construction process management, B/S
PDF Full Text Request
Related items