EPC Contracting For Daqing Oilfield South7-1Joint Station Project Management Research

Posted on:2013-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:S GuanFull Text:PDF
GTID:2249330371979479Subject:Project management
Abstract/Summary:PDF Full Text Request
Our country since1980s carrying out items of basic construction project primarycontractor management, Looked from the engineering construction domain trend ofdevelopment that, the domestic and foreign large and middle scale engineering project,specially the petroleum chemical industry items of basic construction alreadygenerally used EPC (Engineering—Procurement—Construction,was called EPC) theprimary contractor management pattern. In Daqing oilfield engineering constructiondomain, Daqing oilfield Design institute and after Daqing oilfield construction groupreorganization conformity, has had the design synthesis a-grade intelligence andconstruction primary contractor top grade intelligence specialized ability,simultaneously has also had the items of basic construction EPC primary contractormanagement intelligence and ability. This article studies south the Daqing oilfield7-1union station project, is the oil field which implements based on the EPC primarycontractor pattern organization produces can the construction project, has thelarge-scale petroleum engineering items of basic construction typical nature and therepresentation, through the beefed-up design-purchase-construction cooperation,displays the design instruction purchase, the construction function fully, the safeguardengineering construction each work order movement, the realization design-purchase-constructs the entire process integration to manage and to control, reduces theconstruction cycle, reduces the project expense, the full display supposes the DaqingoilField to count the courtyard and the construction group in the design and the construction aspect specialized technical special skill, through items of basicconstruction implementation, EPC primary contractor management pattern andformerly The traditional project contract pattern carries on the comparison and theanalysis, proposed the improvement opinion and the measure, accumulate the moremanagerial experience, provides the demonstration and the model for the Daqingoilfield items of basic construction EPC primary contractor pattern under managementresearch.According to project management characteristics determine the followingimprovement goal: overall coordination design-purchasing-construction of threeparties relation, highlight the optimization design and the construction process ofdesign improvement, realize the EPC projects department independent purchasingmanagement mode of the effective operation of the parties to strengthen informationcommunication and work cohesion, the formation of design-purchasing-three partyconstruction the new mode of cooperation; Through the project general contracting ofmanagement mode EPC and improvement in the project general contracting enterprise:Daqing oilfield engineering construction Co., LTD. Establish EPC contractmanagement of the internal mechanism, give full play to its own professional technicalreserves advantage and the construction of a productivity of the management of theengineering oilfield advantage, to develop the contracted project management abilityEPC compound talents, at the same time in the design management, procurementmanagement, construction management and HSE management professionalmanagement staff training, improve the Daqing oilfield construction projectcontracting of EPC management level, and gradually realize standardizationmanagement. EPC contract mode based on the project management, this paper mainlydiscusses the design project management and purchasing management andconstruction management of operation mode, and the design and purchase, design andconstruction, procurement and construction of each section of interface relations and the control points; EPC contract mode based on the core management, mainlyincluding the project’s quality control, progress management, cost management andHSE management, combined with the construction of a productivity of Daqing oilfieldengineering practice, the key to the project HSE management relevant content isexpounded, including project management countermeasures, occupational health andsafety management measures and environmental protection management measures,identification of this project HSE management risk, formulate HSE management planand organize the implementation of content; Based on the EPC contract modeimprovement measures include: implementation of EPC contract project managementmode, advance the project EPC contract management improvement, promote theproject manager responsibilities and pushing the project cost Accounting System.South7-1south stand engineering project in joint on30July2010completed andput into use. The project built alleviates the Daqing oilfield crude oil output tensesituation, to ensure that the Daqing oilfield for40million tons of crude oil productionstable won the initiative. Project put into production, so far, the system safe andsmooth operation, to reach the design production capacity index, accord with security,fire control, health and environmental protection requirement. Through the in south7-1joint project implementation in standing EPC contract mode of projectmanagement, effectively solves the traditional contract mode design-purchasing-everyconstruction does not follow the link closely malpractice, achieve the expectedresearch target, to project general contracting enterprise: Daqing oilfield engineeringconstruction Co., LTD occupies more domestic and international engineeringconstruction market with advanced management experience, and to promote theDaqing oilfield engineering construction areas of overall management level.
Keywords/Search Tags:EPC contracting, project management, Improvement countermeasures
PDF Full Text Request
Related items