In this paper, for the current construction project progress and rationaldeployment of the relevant theory proceed with research, and construction projectstube control and a reasonable allocation of the existence of the problem and reasoncarry out the analysis, depth explained the Construction Project Management tubecontrol and a reasonable allocation of some inadequacies in the study of the causes ofthese problems on the basis of the entire progress of the tube control and rationaldeployment of optimization and improvement of measures focused on theintroduction. Specific to the careful progress and deployment plan, developed inConstruction Project Management tube control and reasonable deployment process,strengthen the overall progress of the control team construction, to protect theprogress control and the actual construction of the balance to enhance the progress ofthe construction personnel control consciousness, reasonable arrangements forconstruction machinery and the working condition, and conduct regular assessment ofwork progress control and improve the progress control and the deployment of thesystem. I hope the staff to be a reference to more in-depth study on the constructionproject progress control and rational deployment of a more effective program topromote the progress of the control throughout the construction progress of the projectwork to promote the sound development of the construction project. |