Font Size: a A A

Tailing Pond Hazard Analysis And Safety Evaluation Guidelines Recommend A Program Of Study

Posted on:2008-03-02Degree:MasterType:Thesis
Country:ChinaCandidate:J M DingFull Text:PDF
GTID:2191360245955701Subject:Safety Technology and Engineering
Abstract/Summary:PDF Full Text Request
Tailings Pond was an important component of mine production facilities, which can be considered as a man-made mud-rock flow formation with high potential energy essentially. Tailings have many kinds of toxic materials, which is a big threat to the ecological environment around and inhabitant's health of body and mind, it is not rare that tailings pond's great accident happenedWith the development of industry, there were more and more Tailings Dam, the height of Tailings Dam is higher and higher, therefore, the safety of Tailings Dam is vital, the safe stability of Tailings Dam relates to the safety of lives and estate of downstream's people, GRF promulgated the < Tailings Dam safety technique rules> and < Tailings Dam safety supervising administration rules >, and made safety assessment to Tailings Pond, but regular guide of safety assessment of Tailings Dam is not constructed yet.This paper got the critical factor of Tailings Pond's stability through analyzing Tailings Pond's storage capacity and the technique of constructing Tailings Pond, by limit-balance method, analyzing the stability of Tailings Dam according to physical characters of Tailings Dam, soaking line. Through the analysis of inner mechanism of Tailings Pond's safety, this paper identified hazardous factors of each unit and analyzed quantified the inducement of Tailings Pond's accidents, determined the hazardous factors of each unit , possible accident peril and effect, constructed the hazardous sources model and ranked the hazardous sources, draw up Tailings Pond PHA(Preliminary Hazard Analysis)table, put forward management measures according to the hazardous factors of each unit, found the elemental event of Tailings Pond's break, draw up FTA of Tailings Pond's break, pointed out the safety administration object and factor through FTA. According to safety assessment of Tailings Pond, divided the assessment units, draw up the SCL, and quantified each of the investigated units. The analysis above supplied basis to the construction of safety assessment rule on Tailings Pond and put forward a suggestive plan of safety assessment rule based on the analysis above.
Keywords/Search Tags:Tailings Pond, Safety Assessment, Fault Tree Analysis, safety assessment rules
PDF Full Text Request
Related items