Font Size: a A A

A Study On Project Of The Upgrading Reform For The Client Service System Of Qingdao Power Supply Company

Posted on:2009-10-18Degree:MasterType:Thesis
Country:ChinaCandidate:M X PanFull Text:PDF
GTID:2189360242986933Subject:Project management
Abstract/Summary:PDF Full Text Request
Under the background of the Electrical Power Corporation reform,a thorough investigation and analysis to the old client service system of Qingdao Power Company have being done in this work. Combined with the rapidly developed modern calling center technique, relevant theories of project management are employed to study the realization of upgrading reform for the client service system of Qingdao Power Company. This paper has analyzed the management process related to that of project scope and progress; Particularly, consider the stringent time requirement of the client service upgrading, it is mainly focused on the analysis of planning project scope and progress,tracing and control in process,how to analyze offset errors and to correct them; An applicable scheme has been proposed for solving the real problems.
Keywords/Search Tags:Electrical power client service, Calling center technique, Project management, Electrical power cooperation reform
PDF Full Text Request
Related items