Font Size: a A A

Software System Integrated Project Risky Management Disquisition

Posted on:2010-02-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z F MuFull Text:PDF
GTID:2178360272488026Subject:Project management
Abstract/Summary:PDF Full Text Request
With in recent years international terrorism influence name of the buyer or payee, take systematic emergency field construction seriously in every country , supplier has also brought forward more and more high call for to the software being a field's turn therefore , emergency field system software supplier has directed on more and more big emergency field throwing into for answering the Chinese government, have improved and self's control level , has adopt project technological process administration, especially having reinforced the project risk administration improve self's control level in numerous and confused provision. Emergency field software system integration business strides over discipline such as technology , swapper , computer art , IT communicating by letter, integration dealing with the computer , telecommunication and video frequency image technology, company's interface, is other numerous and complicated including hardware , the software , with , period implication risk is therefore especially enormous , have higher call for to risks administration among them.And the main body of a book the characteristic according to software system integration enterprise , the knowledge according to project administration, be tied in wedlock three Jinan specific items-in-one, analyse risk factor in software integration project exploitation process , join the knowledge being in progress to risk arguing, application in suggesting that measure and method answering risk, have summed up the project risk administration at the same time in specific items. And three Jinan system integration-in-one project subsystem is comparatively many, integrated interface of three companies, that the project gets it in gear therefore in Jinan has been able to finish coming untied a hereafter , the speciality has organized a Jinan project risk analysis symposium , has discussed various risk coming across in designing exploitation process in project and has answered measure. Concrete content includes seven aspect, one being to work out the detailed rate of progress arranging a plan for, that two is that the workpiece outputing needs is strict judge examine, three are to communicate with the consumer in time , four are communicating with of all project personnel of group , five is that the interface is clear and definite with the firm rate of progress working together , six is to work out a testing using an example , seven are to work out the plan allying self with a debugging.Risk analysis that the field there exists in system's by the main body of a book to the emergency, hope that there is institute gain in construction to the system being a field's turn , can play arrive at know actively role to the project exploitation.
Keywords/Search Tags:The project management, The project risky management, The software develops, System integration, Three platforms-in-one
PDF Full Text Request
Related items