Font Size: a A A

Changchun Population And Family Planning Commission Information-based Construction Project Implementation

Posted on:2006-09-19Degree:MasterType:Thesis
Country:ChinaCandidate:W G ZhangFull Text:PDF
GTID:2168360182957219Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The Changchun Population and Family Planning Commission combines the real business of the population and family planning system, under the guidance of information-based theory of the kownledge economy, use the advanced information technology, it propose solution when it is the 1122 information-based project, namely pieces of unified network, the pieces of unified information management platform, centre of two pieces not basic (data in the center, communication in the center), supplemented by two kinds of special application means (GIS system is used, the IC card is used), accelerate developping steps that the information-based construct and implement. In the project demand analysis process, is clear about the construction goal is constructs advanced, is mature, the highlyeffective information system; Emphasis construction content: The conformity the population and family planning system special net, outside the office automation network, the gateway the net, four levels of networks, the construct with proper priority information management platform, its core application in public aspect and so on information issue, office automation, special-purpose information management, statistical report form and assistance decision-making . In the plan basic thought, the information management platform construction plan passes six unifications, the many kinds of tools, the engine mechanisms, many kind of connections, guarantee the system to construct conveniently, quick, safe, are reliable. Six unifications namely unify the platform, the realization network conformity. Unified resources, realization information sharing. Unified standard, realization service integration. Unified management, realization maintenance conveniently. Unified security, realization safeguard sharing. Unified overhead construction, realization highly effective development. Provides the resource management, the service has custom-made, the work class has custom-made, form ordering, the assistance correspondence and so on the many kinds of applications builds the tool. Provides may carry on the application system the information to trigger, transmission, explanation, transfer, transformation, performance, and so on engine mechanism. Reserved the many kinds of connections, the module namely inserted namely uses. The network platform construction system design, persisted in guarantee highly effective, in practical foundation, realization three nets and a storehouse the goal, namely the province, the city, the county three levels comprehensively complete the population and family planning information-based society to manage and to serve the local area network. Establishment province, city, county, township four levels of resources WAN. The province, the city, the county, the township local area network interlocks through WAN, forms WAN; Depends on the Internet to establish all levels of the population and family planning department public information website. The Changchun Population and Family Planning Commission network construction inclodes, WAN constructs, in the work specialnetwork construction, the work the net constructs three parts. The information management platform software system design, must realize the 1122 information-based projects goal. Principle of design proper attention to both fineness and maturation, openness and standard, usability and sharing, feasibility and usability, security and reliability. Definite system design logic model and data exchange pattern. Take the modern computer software development, the network using the development, multimedia, the network communication, the data warehouse, Web Services, the work class, the form has custom-made, the module and so on the advanced technology as a foundation, uses B/S and C/S unifies the system structure, the application international is .NET is the overall development frame, auxiliary by advanced Intranet information service pattern, WebService, XML data communication pattern, definition standardization interface specification, supports the many kinds of databases coordination application, carries on between various operational channel and various databases the seamless connection. Uses the advanced network security and the key technology, guarantees the network and the data security, the realization automation, the intellectualization, the integration, as well as data highly effective sharing. The platform software system composition mainly by exterior gateway website information issued the platform, the synthesis service applies the platform, the data center and the communications center four parts of constitutions. The application pattern uses by the administrative division divisiontree shape graduation structure. The overall system divides into the provincial level, the city (state) the level and the county (city, area) the level three big information platforms, sur-township (town, street) level and village (community) level information station. All levels of the population and family planning department construct the gateway website foreign issue government affairs information. The construction integrity comprehensive business management platform, including the administration of office system, the long-distance report form system, the OLAP data statistics and the decision analysis system, the woman of child-bearing age synthesizes the information management system, the resident migration population synthesis information management system and so on, among, the provincial level information platform and various cities (state) the level information platform besides covers the above basic management system management system, but also provides GIS geography application system, IC card application system and so on expansion function. At the same time establishes the data center and the communication center, the data center mainly is various class numbers which integrates in the information management platform carry on the unification management according to the resources , the communications center through the comprehensive communication method, realization file transfer, immediate news transmission, email, short note reminder, immediate news reminder, short note service and motion work and so on function. The system security construction defers to the unified plan, thelabor division with individual responsibility, the comprehensive guard, the overall security, the graduation protection, the being sure need the actual effect the principle, establishes the information security system, fully considers aspect overall security in the physics, network, system, information , application and so on. Take applies and the actual effect as the leadership, the management and the technology pays equal attention to, establishes the synthesis guard mechanism, the safeguard government affairs application system security, highly effective runs. The software aspect through the system access control, the system security backup, the system information security, the Windows operating system brings the safety mechanism, the data backup, CA, the anti-virus software, the loophole sweeping system, uses SSL method encryption transmission mechanism in the transmission and so on. The network aspect through rents the telecommunication bureau the VPN special line, the firewall design, security exchange of information system design, physical isolation and so on. The application system movement environment disposition must unify the software and hardware application situation and the actual service need, must consider the hardware environment request the lowest request, as well as software technology long term request. The project demand specification needs to act according to the actual condition and the limiting condition, refers to National Standard WIS Foundation Construction Of Data And Classified Code,9Changchun each kind of the population and family planning system report form and People's Republic of China Population And Birth control Law, understood the performance demand, the perfect function demand, achieves the movement demand. The project construction step uses the overall plan and minute step of implementation of the procedure, under the overall strategic frame, the union actual situation, embarked from the total view, has formulated the infrastructure construction and the gateway construction, the synthesis service platform construction, consummates the entire province four levels of networks information-based application three stages information system development plans. In summary, implements the becoming an information-based society impetus strategy vigorously, by the becoming an information-based society impetus population modernization, is one of new mechanism construction core contents of new century the population and family planning system in Changchun. After several year difficult endeavors, the whole city the population and family planning system the becoming an information-based society work to start by the construction stage rapidly to change the comprehensive application stage, the information-based work have done the National Population Family Planning Commission of China, the Jilin provincial party committee, the Jilin Province government, the Changchun party committee, the Changchun government's full affirmation, demonstrates the happier prospects for development.
Keywords/Search Tags:Information-based
PDF Full Text Request
Related items