Font Size: a A A

Studying Of Project Risk Management For Hydropower Engineering

Posted on:2006-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:Z Q ZhuFull Text:PDF
GTID:2156360152982968Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
The article combined with the modern risk management theory to the hydropower projects' features and practices in our country, raised the conception of the hydropower project risk management and designs integrated project risk management model .From the point of investors, the article designs engineering project risk assessment index system and builds an engineering project risk assessment model on Fuzzy mathematics integrated method to solve the problem of engineering project risk assessment, using example to explain the possibility of the engineering project risk assessment. And based on the distinguishing and judging of the risk on hydropower project, the article researched the means of evading risks and designs the system of the hydropower engineering insurance in our country. Finally, the article discusses the theory of decision making of risk management in the hydropower projects, applies TOPSIS in the process of hydropower projects to test the model through some examples and designs the model of the risk management decision in the hydropower project...
Keywords/Search Tags:hydropower engineering, integrated project risk management model, fuzzy mathematics integrated method risk assessment model, engineering insurance, topsis
PDF Full Text Request
Related items