Font Size: a A A

Jiahezi Reservoir Flood Resource-rization Operation

Posted on:2009-10-12Degree:MasterType:Thesis
Country:ChinaCandidate:D F WuFull Text:PDF
GTID:2132360245485576Subject:Agricultural Soil and Water Engineering
Abstract/Summary:PDF Full Text Request
Our country happend flood disaster frequently, also lies under a grave shortage of water resource, per capita water resource amounts are only 1/4 per capita water resource of world amounts, and the space-time distributing of water resource is also very unevenly. Especially in Xinjiang, water resource is on the edge of empty, water inadequate resources already becomes the key factor restricting national economy and social development. In addion, the flood damage is more and more heavy, the loss bringing about also has the growing trend. The flood disaster and water resource shortage already become bottleneck problem of country and region economic growth..With the fact that our country national economy fleet development, the durative rise in the people living standard and the acceleration of urbanization , wealth and the population are getting concentrated with every passing day, the more highly demand synthetical target that flood protection safety and water supply ensure has been proposed for reservoir by society and the national economy sustainable development.How to play the existing project effectively under ensureing the safety of reservoir, making use rationally of piling up storage capacity is the one of the effective means being the beneficial result relieving our country water resource imbalance between supply and demand and improving reservoir comprehensive utilization. Based on the double characteristic property of flood resource advantages and disadvantages and the conception changing from flood-control to flood-manage, and resource-rization with the reservoir flood ability, optimizing reservoir flood protection parameter and regulation to carrying out reservoir flood resource-rization controller is that one kind of direct , economical un-project measure , may for the water making use of rain or flood resource effectively and change the water from flood period into un-flood period.In our country western part arid area, the representative significance continental river basin—Jiahezi reservior in Xinjiang Manas basin has been choosed as the object of study , the following carrying out:(1) Flood resource-rization operation feasibility studyIt's necessary to felt out lower reaches flood protection current situation and self reservoir flood protection current situation, analyse the reservoir design flood and check the reservoir flood control standard, set up the key parameter of flood protection, ascertain the actual flood control capacity of reservoir, at the end, make judgement about implementing flood resource-rization controller feasibility and necessity to reservoir's.(2) Researching of limited water level by stagesAnalysing the river basin hydrology characteristic and the Manas River runoff seasonal property by stages was done, and various methods are adopted to ascertain and divide flood period, count the design flood periodization by stages, drew out the various flood limited water level scheme , throngh simulating the reservoir scheduling rule, analyzed the managing risk of flood limited water level scheme and ascertaining a proper one. At the same time, tried to study the ten-days period water level on flood period and fuzzy limited water level in the flood season based on the analysis of the runoff characteristic.(3) Limit water level dynamic control in flood seasonTo overcome the static characteristic that the passive flood defending limited water level by stages having, the paper analyses the flood forecasting inTab.ation model sTab.ility, accuracy and prevision scheduled time, and gave an accepting dynamic control region by simulating operation to ensure the safety of flood limited water level dynamic control. At the end, worked out the real time operation ways and the scheduling rule. Via the research, Jiahezi reservoir actual project condition does not have the feasibility putting flood resource-rization operation into practice, however, as studying , the flood control capacity is restricted by the anthor with reservoir current situation for the safety standard, it's reseached on the limited water level by stage and dynamic control relevant content. The regulation flood control and managing ways of the flood limited water level has been ascertained, and gave reservoir real time operation method. All things done by this paper have done theory trial for the arid irrigation area reservoir flood resource-rization operation.
Keywords/Search Tags:Arid irrigation area, Jiahezi reservoir, Flood resource-rization operation, Limited water level by stages, Limit water level dynamic control in flood season
PDF Full Text Request
Related items