The Bid Scheme Design System Of Large-Scale Hydro-Generators

Posted on:2007-10-12Degree:MasterType:Thesis
Country:ChinaCandidate:H Y ZhaoFull Text:PDF
GTID:2132360185485572Subject:Mechanical design and theory
Abstract/Summary:PDF Full Text Request
The knowledge of design and experience plays an important role in the product design because the structure of large-scale hydro-generators is complex and high-tech. Different power stations have different design parameters, so the corresponding generators must be redesigned. At present, the competitions among the enterprises which product hydro-generators'equipments become more and more furious. In order to get more opportunities, every enterprise has to send persons to bid frequently. Though the rate of bid is very low, making the bids is a hard work. Therefore, how to make a high quality hydro-generator's design scheme at speed according to the users'requirement is the key to the enterprises'survival in the market economy.The bid scheme design of the large-scale hydro-generators consists of the electromagnetic design and the structure design. Firstly, the paper makes researches on the electromagnetic scheme design of the hydro-generators, works out the flow chart of the electromagnetic scheme design of the hydro-generators, proposes the method of the electromagnetic scheme design of the hydro-generators based on Case-Based Reasoning, states the extraction and expression of similar electromagnetic examples, and gives out the search arithmetic of similar electromagnetic schemes, which calculates out the similarity between examples according to the 7 decision-making parameters.According to the characteristics of the hydro-generator scheme design, the integration of CBR and RBR is also studied. Taking advantage of these two reasoning technologies, it overcomes the negative influence on the reasoning rate of the system, which is affected by the huge and rich knowledge base, and improves the working efficiency and quality of the system.The structure scheme design is another important part of the bid design system of the large-scale hydro-generators. The paper points out the main contents of the structure, involving the stator design, the rotor design, the thrust-bearing design, the guide-bearing design and the loaded-framework design. Every scheme design module has its own function, which communicates and cooperates with each other by messages and data flows. So the structure scheme...
Keywords/Search Tags:Artificial Intelligence, Case-Based Reasoning(CBR), Rule-Based Reasoning(RBR), the large-scale hydro-generator, scheme design
PDF Full Text Request
Related items